Case study

Integrated Services for a Number of Exploration & Well Development Campaigns Onshore

Capture d’écran 2020-08-25 à 2.45.21 PM

Project

Addax Petroleum was granted in January 2014 a PSC for a 10-year period. The Company’s objective was to upgrade and increase production of underdeveloped properties in established basins by utilizing advanced & proven technologies.

The Dinonga & Irondou licenses are Addax Petroleum’s principal onshore Gabon producing licenses and include the Tsiengui and Obangue fields. located approximately 100 km south-east of the coastal city of Port-Gentil.

The Operator is Addax Petroleum.

Our Scope

The provision of multi-discipline engineers and superintendents covering to the following activities:

  • Tendering, wells construction & engineering, workover completion, supervision, reporting, costs control.
  • Competence training courses in drilling fluids, cementing & waste Management.
  • Studies, audits for drilling fluids, cementing & waste management operations.

Activities covered

Drilling - Completion - HSE - Fluid, Cement & Waste - Logistics - Contract management - Cost control

Team Deployed

15 Expatriates

GABON

2013 - Present